Top yields are the result of a high degree of efficiency and constant fault-free operation. Our Powador central inverters are extremely reliable devices. You don’t have to be on the planet’s sun belt to get high yields. Naturally this is good news for all installation operators and investors in solar industry stocks: Large solar parks are not only good for the environment, they are also a secure and lucrative financial investment.
Monti di Eboli, Italy
Plant size: 24 MW
Inverter: Powador XP350-HV TL
Commissioning: 2011
Stribro, Czech Republic
Plant size: 13.6 MW
Inverter: Powador Megawatt-Station
Commissioning: 2009
Borna, Deutschland
Plant size: 8.5 MW
Inverter: Powador XP350-HV TL
Commissioning: 2011
Alange, Spain
Plant size: 8.49 MW
Inverter: Powador 33000xi
Commissioning: 2008
Quintanar del Rey, Spain
Plant size: 1.9 MW
Inverter: Powador XP100-HV
Commissioning: 2008
Calasparra, Spain
Plant size: 1.59 MW
Inverter: Powador 33000xi Park
Commissioning: 2008
Energy production (p.a.): approx. 1,975 kWh/kWp
Return (p.a.): approx. 1,353,450 Euro
La Réunion, France
Plant size: 1.3 MW
Inverter: Powador 30000xi
Commissioning: 2006
Florina, Greece
Plant size: 1 MW
Inverter: Powador 33000xi
Commissioning: 2010
San Cassiano, Italy
Plant size: 996 kW
Inverter: Powador 33000xi Park
Commissioning: 2009
Westerheim, Germany
Plant size: 986 kW
Inverter: Powador 33000xi Park, Powador 9600
Sanarica, Italy
Plant size: 986 kW
Inverter: Powador 33000xi
Commissioning: 2009
Simbach, Germany
Plant size: 982 kW
Inverter: Powador 5000xi, Powador 2500xi
Commissioning: 2008
Energy production (p.a.): approx. 1,170 kWh/kWp
Jindo, South Korea
Plant size: 923 kW
Inverter: Powador XP100-HV
Commissioning: 2008
Reichstorf, Germany
Plant size: 298 kW
Inverter: Powador XP100-HV
Commissioning: 2008
Messinia, Greece
Plant size: 200 kW
Inverter: Powador 33000xi Park
Commissioning: 2008
Fabbrico, Italy
Plant size: 199,87 kW
Inverter: Powador 33000xi
Commissioning: 2011
Hollenbach, Germany
Plant size: 152.5 kW
Inverter: Powador 30000xi, Powador 3500xi, Powador 2500xi
Commissioning: 2007